DSVA Pits | Premier Pits https://www.premierpits.com Garage Pits Mon, 18 Sep 2017 09:01:58 +0000 en-GB hourly 1 https://wordpress.org/?v=5.8.10 Heavy Reinforced Concrete Floor Case Study https://www.premierpits.com/portfolio-posts/heavy-reinforced-concrete-floor-case-study/ Mon, 04 Sep 2017 10:38:03 +0000 https://www.premierpits.com/?post_type=portfolio&p=1391 To replace a traditional pit, for a leading transport company, in what was originally a heavily reinforced factory floor in The Midlands.

The post Heavy Reinforced Concrete Floor Case Study first appeared on Premier Pits.]]>

The Project

To replace a traditional pit, for a leading transport company, in what was originally a heavily reinforced factory floor in The Midlands.

The Problem

A patchwork floor of irregular concrete depths, only discovered during breaking up. Several machine bases between 1.5 and 2.0 metres thick had to be removed. Also exposed a single post underground lift shaft with a reservoir full of hydraulic oil.

Solution

To work around the clock and to bring in extra heavy machinery, including two 360 degree machines and a JCB for clearing.

Outcome

Project successfully completed and a customer delighted with the application and perseverance shown by the Premier Pits team.

Client Details

Location: The Midlands

Specification

One 18 metre long pit; 0.9 metres wide and 1.350 metres deep.