Soft Sand Installation Case Study
Installing two working pits and one full MOT pit into a newly built workshop.
Installing two working pits and one full MOT pit into a newly built workshop.
Replacement of three brick and block pits due to severe leakage from high water tables and dealing with an overflow of water during the installations of the new pits.
Premier Pits
Town Drove,
Quadring,
Spalding
Lincolnshire
PE11 4QP
ENGLAND